International  Freight  Forwarders,  Consolidators  &  Project  Handler

 

+ Karachi Port  
+ Bin Qasim Port    
+ Airlines Codes  
+ Useful Terms         
+ Useful Links           
  + Air Tracking 
  + Sea Tracking
  + Weight Converter 
  + Length Converter 
 
 
 

 

 

Karachi port is presently operating three oil piers exclusively used for tanker vessels, situated at the entrance of the port. Limitations and restrictions of these piers are as under

Berth No

Max Draft

Limit Restrictions

Displacement

Products Handled

 

LOA

Beam

 

OP-1

39' 00"

850' 00"

130' 00"

95,000 m/tons

Crude oils, Fuel oil, Gas oil, Kerosene oil

OP-2

35' 00"

750' 00"

100' 00"

50,000 m/tons

All Edible oils, Molasses, All Chemicals, Lubes

OP-3

39' 00" ( I )

850' 00"

130' 00"

95,000 m/tons

Gas Oil, Fuel Oil and loading of Molasses & Naptha

OP-3

37' 00" ( E )

130' 00"

130' 00"

95,000 m/tons

Gas Oil, Fuel Oil and loading of Molasses & Naptha

(I) = Import, (E) = Export

In addition to the above, there is a receiving facility at berth No 26 West Wharf, where vessels normally discharge small parcels of palm oil, tallow and lube oils while berthed abreast of another vessel. This is subject to the availability of storage and the consignees arrangements with the terminal.

At berth No 26 west wharf the draft is restricted to 32 feet.

Please be advised that Gas Oil, Crude Oil, Jet Oil, Fuel Oil, Naptha and MTBE are Govt. Cargos and get priority on instructions from Ministry of Petroleum to port authorities.

For all other products, tanker berthing is on a "first come first serve basis."